Global Trends Today
  • News
  • Economy
  • Investing
  • Stock
  • Editor’s Pick
No Result
View All Result
  • News
  • Economy
  • Investing
  • Stock
  • Editor’s Pick
No Result
View All Result
Global Trends Today
No Result
View All Result
Home Investing

Canadian Critical Minerals: Advancing Bull River Copper Mine Back to Production

by
May 24, 2024
in Investing
0
Canadian Critical Minerals: Advancing Bull River Copper Mine Back to Production
0
SHARES
3
VIEWS
Share on FacebookShare on Twitter

Canadian Critical Minerals (TSXV:CCMI,OTCQB:RIINF) advances two copper projects in tier 1 mining jurisdictions in Canada. The main project is the 100 percent-owned Bull River Mine near Cranbrook, British Columbia with a mineral resource of 135 million pounds (Mlbs) copper. CCMI also owns a 34 percent interest in the Thierry mine at Pickle Lake, Ontario, which has a mineral resource base containing 1.3 billion pounds (Blbs) copper with other metals, including nickel, silver, palladium, platinum and gold.

CCMI plans to restart the Bull River mine and return it to production. The company is currently securing permits to restart the mine at its designed capacity of 700 tons per day (tpd). In the meantime, CCMI has begun selling pre-concentrated copper, gold and silver ore from the surface stockpiles at Bull River through an ore purchase agreement with New Afton.

In April 2024, the company transported 362 wet metric tons (wmt) of mineralized material to New Afton and received a payment of US$72,445 for the shipment. The sale of stockpiles should provide near-term cash flow, which will be used to restart the Bull River mine. The current stockpile at Bull River is estimated at 180,000 tons (or 6.14 Mlbs copper equivalent) valued at approximately C$30 million.

The Bull River project is near Cranbrook, British Columbia and comprises 21 mineral claims covering an area of 10,285 hectares. It is a tier 1 mining jurisdiction with year-round access to the site by paved and all-weather roads, as well as being connected to the BC Hydro hydroelectric power grid. Bull River was a producing mine from 1971 to 1974.

Company Highlights

Focused on restarting the past-producing Bull River mine, currently under care and maintenance.The mine has a current surface stockpile, which is generating revenue for the company, estimated at 180,000 tons (or 6.14 Mlb copper equivalent), valued at ~C$30 million.The Thierry Project is a past-producing copper and nickel mine with excellent infrastructure and year-round access. The current mineral resource estimate indicates 1.3 billion pounds of copper.Given its 34 percent interest in Thierry mine, CCMI can benefit from any positive assay results from the drilling program at Thierry mine completed last year and future exploration.

This Canadian Critical Minerals profile is part of a paid investor education campaign.*

Click here to connect with Canadian Critical Minerals (TSXV:CCMI,OTCQB:RIINF) to receive an Investor Presentation

This post appeared first on investingnews.com
Previous Post

Asked to pick between reality and Trump, the right’s choice is easy

Next Post

Ocumetics Announces Completion of First Tranche of Debenture Private Placement for Net Proceeds of CA$2.82 Million

Next Post
Ocumetics Announces Completion of First Tranche of Debenture Private Placement for Net Proceeds of CA$2.82 Million

Ocumetics Announces Completion of First Tranche of Debenture Private Placement for Net Proceeds of CA$2.82 Million

    Fill Out & Get More Relevant News


    Stay ahead of the market and unlock exclusive trading insights & timely news. We value your privacy - your information is secure, and you can unsubscribe anytime. Gain an edge with hand-picked trading opportunities, stay informed with market-moving updates, and learn from expert tips & strategies.

    • Trending
    • Comments
    • Latest

    Hacker lexicon: What is a supply chain attack?

    June 11, 2021

    Losing Depop to US ownership makes the British tech sector look secondhand

    June 11, 2021

    Andrew Lloyd Webber to sue the Government if theatres are not fully reopened from June 21

    June 11, 2021

    Microsoft’s Kate Crawford: ‘AI is neither artificial nor intelligent’

    June 11, 2021
    Bitcoin Well Expands Rewards Program To Include The Bitcoin Well Points Store

    Bitcoin Well Expands Rewards Program To Include The Bitcoin Well Points Store

    0

    Reply to “Reply to Whitehead” by Desvousges, Mathews and Train: (4) My treatment of the weighted WTP is biased in favor of the DMT (2015) result/conclusion

    0

    The 40 Weirdest (And Best) Charts We Made In This Long, Strange Year

    0

    Will The Debate Over $2,000 Stimulus Checks Help Democrats In Georgia?

    0
    Bitcoin Well Expands Rewards Program To Include The Bitcoin Well Points Store

    Bitcoin Well Expands Rewards Program To Include The Bitcoin Well Points Store

    May 8, 2025
    Los Andes Copper at 121 Mining Investment London

    Los Andes Copper at 121 Mining Investment London

    May 8, 2025
    Bold Ventures to Present at Metals Investor Forum in Vancouver on May 9, 2025

    Bold Ventures to Present at Metals Investor Forum in Vancouver on May 9, 2025

    May 8, 2025
    Group Eleven Intersects 12.0m of 2.30% Cu and 560 g/t Ag, Including 6.4m of 3.72% Cu and 838 g/t Ag, Demonstrating High-Grade Copper and Silver Potential at Ballywire

    Group Eleven Intersects 12.0m of 2.30% Cu and 560 g/t Ag, Including 6.4m of 3.72% Cu and 838 g/t Ag, Demonstrating High-Grade Copper and Silver Potential at Ballywire

    May 8, 2025

    Recent News

    Bitcoin Well Expands Rewards Program To Include The Bitcoin Well Points Store

    Bitcoin Well Expands Rewards Program To Include The Bitcoin Well Points Store

    May 8, 2025
    Los Andes Copper at 121 Mining Investment London

    Los Andes Copper at 121 Mining Investment London

    May 8, 2025
    Bold Ventures to Present at Metals Investor Forum in Vancouver on May 9, 2025

    Bold Ventures to Present at Metals Investor Forum in Vancouver on May 9, 2025

    May 8, 2025
    Group Eleven Intersects 12.0m of 2.30% Cu and 560 g/t Ag, Including 6.4m of 3.72% Cu and 838 g/t Ag, Demonstrating High-Grade Copper and Silver Potential at Ballywire

    Group Eleven Intersects 12.0m of 2.30% Cu and 560 g/t Ag, Including 6.4m of 3.72% Cu and 838 g/t Ag, Demonstrating High-Grade Copper and Silver Potential at Ballywire

    May 8, 2025

    Disclaimer: GlobalTrendsToday.com, its managers, its employees, and assigns (collectively "The Company") do not make any guarantee or warranty about what is advertised above. Information provided by this website is for research purposes only and should not be considered as personalized financial advice. The Company is not affiliated with, nor does it receive compensation from, any specific security. The Company is not registered or licensed by any governing body in any jurisdiction to give investing advice or provide investment recommendation. Any investments recommended here should be taken into consideration only after consulting with your investment advisor and after reviewing the prospectus or financial statements of the company.

    • Privacy Policy
    • Terms & Conditions

    Copyright © 2025 globaltrendstoday.com | All Rights Reserved

    No Result
    View All Result
    • News
    • Economy
    • Investing
    • Stock
    • Editor’s Pick

    Copyright © 2025 globaltrendstoday.com | All Rights Reserved